this post was submitted on 23 Jun 2024
265 points (97.8% liked)

Autism

6663 readers
148 users here now

A community for respectful discussion and memes related to autism acceptance. All neurotypes are welcome.

We have created our own instance! Visit Autism Place the following community for more info.

Community:

Values

  • Acceptance
  • Openness
  • Understanding
  • Equality
  • Reciprocity
  • Mutuality
  • Love

Rules

  1. No abusive, derogatory, or offensive post/comments e.g: racism, sexism, religious hatred, homophobia, gatekeeping, trolling.
  2. Posts must be related to autism, off-topic discussions happen in the matrix chat.
  3. Your posts must include a text body. It doesn't have to be long, it just needs to be descriptive.
  4. Do not request donations.
  5. Be respectful in discussions.
  6. Do not post misinformation.
  7. Mark NSFW content accordingly.
  8. Do not promote Autism Speaks.
  9. General Lemmy World rules.

Encouraged

  1. Open acceptance of all autism levels as a respectable neurotype.
  2. Funny memes.
  3. Respectful venting.
  4. Describe posts of pictures/memes using text in the body for our visually impaired users.
  5. Welcoming and accepting attitudes.
  6. Questions regarding autism.
  7. Questions on confusing situations.
  8. Seeking and sharing support.
  9. Engagement in our community's values.
  10. Expressing a difference of opinion without directly insulting another user.
  11. Please report questionable posts and let the mods deal with it. Chat Room
  • We have a chat room! Want to engage in dialogue? Come join us at the community's Matrix Chat.

.

Helpful Resources

founded 1 year ago
MODERATORS
 
top 19 comments
sorted by: hot top controversial new old
[–] punkwalrus@lemmy.world 29 points 2 months ago (4 children)

"Decline."

Working in IT, I have learned that a lot of meetings are by people who gain "respect and notoriety" by having large meetings. It doesn't matter who shows up, it's the number, that makes them seem popular. "Get the engineers in here, this is serious business!" You begin to learn which PMs do this, and can respond (or not) accordingly. If they ping you "where are you?" you can say, "I am in an [client] audit call. I cannot leave this call while the audit is taking place." Or whatever your industry equivalent is. YMMV, some toxic environments I have been in, this was not possible.

I remember one PM was frozen in indecision. I had to tell him, "I can fix the problem, or having a meeting about it. Pick one."

"Well, both--"

"No. I can fix the problem, or having a meeting about it. Pick one or the other."

"I need you in this meeting!"

"When we explain to the customer that the fix was delayed by an hour, I can use YOUR name, as having a meeting about it instead of fixing it, correct?"

"The meeting is to be about fixing it!"

"No. I can fix the problem, or having a meeting about it. Pick one or the other."

"... we can have the meeting in your office, then."

Eventually, my boss shooed him away.

[–] Cryophilia@lemmy.world 12 points 2 months ago

This is why every project should have at least one of those rare engineers who can actually concisely explain a problem and solution in layman's terms to the PM. Asking the PM to just trust your solution on faith is a bigger ask than you realize.

This is also why you shouldn't have PMs who have zero technical knowledge of what the actual project they're managing is. PMs need to be smart enough to understand the basic idea of what the engineers are telling them. A really good PM will spend time learning at least the basics of the field their engineers work in.

[–] Retrograde@lemmy.world 4 points 2 months ago* (last edited 2 months ago)

I've been in this scenario a few times lol. Spot on.

[–] slazer2au@lemmy.world 3 points 2 months ago

This shits me off so hard. engineers can work or can respond to questions.

[–] EmperorHenry@discuss.tchncs.de 3 points 1 month ago

Working in IT, I have learned that a lot of meetings are by people who gain “respect and notoriety” by having large meetings. It doesn’t matter who shows up, it’s the number, that makes them seem popular. “Get the engineers in here, this is serious business!”

Narcissists always climb to the top positions...by stepping on people to get there.

[–] YourPrivatHater@ani.social 21 points 2 months ago (2 children)

Isn't that normal for everyone?

[–] Kimjongtooill@sh.itjust.works 15 points 2 months ago

I'm not on the spectrum, and I can definitely relate to the meme.

[–] Cryophilia@lemmy.world 2 points 2 months ago

I'm also not on the spectrum, and meetings don't do that for me.

[–] Yprum@lemmy.world 19 points 2 months ago (1 children)

Actually the right side graph needs a correction from my point of view. The decline in productivity doesn't happen sharply when the meeting starts. For me the decline starts between 15 to 30 minutes before the meeting slowly, as I can hardly concentrate concerned that I might miss the start. If I'm ever in hyper concentration mode, most likely I'll miss the start of the meeting.

[–] Hadriscus@lemm.ee 7 points 2 months ago (2 children)

yep. My understanding though is that this was for a surprise meeting, which you wouldn't know about until it starts.

[–] Yprum@lemmy.world 5 points 2 months ago (1 children)

Ah indeed, you are right, somehow I missed the unexpected part. I guess because this applies to just about any meeting to me, not only the unexpected ones so I just applied it generally x)

[–] Hadriscus@lemm.ee 2 points 2 months ago

I can definitely relate. The time before a planned event is basically ruined for me... unless I set an alarm, but I dislike the brutality of it

[–] EmperorHenry@discuss.tchncs.de 1 points 1 month ago

yep. My understanding though is that this was for a surprise meeting, which you wouldn’t know about until it starts.

yes, but the guy above you is also correct

[–] blahsay@lemmy.world 13 points 2 months ago

As an engineer I approve this message

[–] iAvicenna@lemmy.world 11 points 2 months ago

the worst is the unexpected meeting a couple hours later because then you also get the pre meeting productivity drop as well (from the mental anguish of having to go to that meeting an hour later)

[–] stevethegeek@lemmy.world 11 points 2 months ago (1 children)

This is the best explanation for why this happens that I've ever read.

https://www.paulgraham.com/makersschedule.html

I heard about it on Freakonomics, and having been both a creative and a manager it really hits home.

[–] Yprum@lemmy.world 2 points 2 months ago

Absolutely great write up. Thanks for sharing it, I didn't know of it and I'm saving it to share when applicable.

[–] GladiusB@lemmy.world 3 points 2 months ago (1 children)

I have been having to attend these asinine meetings for an hour a day for the last month when they were twice a week for far less time. But since we have an emergency situation the whole plan is discussed with everyone so many times. I know it's a pain, but I feel it takes me away from what I should be working on. I hate it.

[–] jettrscga@lemmy.world 7 points 2 months ago

Oh yeah I love that corporate mindset - there's a major issue so let's take even more time away from fixing the problem.

The issue is management only has one tool (meetings), and if you only have a hammer everything looks like a nail. Surely another meeting will fix it.