this post was submitted on 24 Nov 2023
1 points (100.0% liked)

About model trains and railroading. DIY or professional.

74 readers
1 users here now

Be civil, be respectful, be human.

founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] Luki4020@feddit.de 0 points 11 months ago (1 children)

Thanks, the most work was actually the tracks, after 10+ Years outside it took me 7+ hours to clean them

[–] petrescatraian@libranet.de 0 points 11 months ago (1 children)

@Luki4020 Oh, so the tracks are original as well? Do you plan to extend them in any way?

[–] Luki4020@feddit.de 0 points 11 months ago

At the moment I don‘t have enough space to do a permanent G Scale layout. So I have to build and then pack away everything when I am done. But yes I plan to extend both the tracks and rolling stock in the coming years. Also can‘t wait for next spring to take everything outside for the first time (why I started G Scale, also have a H0 Layout)