this post was submitted on 21 Sep 2024
82 points (98.8% liked)

Technik

302 readers
127 users here now

die Community für alles, was man als Technik beschreiben kann

Beiträge auf Deutsch oder Englisch

founded 4 months ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] genfood 11 points 2 months ago (5 children)

This is dumb ass article, it is common to have engineering stuff happen in excel.

[–] volkerwirsing 7 points 2 months ago

Yeah, but in this case it really is idiotic. They are receiving data via some communication line from the sub, are manually typing it in excel and then are manually loading it into a mapping software. And then they are telling the contractor, who is proposing to use automatic, standard software for that, which is available on the market, to shut up and that they want to develop their own system, which they then proceed do don't develop. That might also be common, but is far away from best practices. Just writing the text message contents to CSV and importing that via cron would have been easier.

load more comments (4 replies)