this post was submitted on 10 Aug 2024
414 points (97.7% liked)

Technology

59665 readers
2586 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] mox@lemmy.sdf.org 1 points 3 months ago* (last edited 3 months ago) (2 children)

it was build into the train by the train manufacturer.

What makes you think the train manufacturer did it? Is that on record someplace? Because the installation and materials don't look at all like the surrounding work. Looks more like a handyman hack job. Now that I've seen the photos, I'm curious about what actually happened there.

[–] a_wild_mimic_appears@lemmy.dbzer0.com 3 points 3 months ago* (last edited 3 months ago) (1 children)

It was not the train manufacturer, but a body shop (Swoboda Karosserie- und Stahlbau GesmbH, now Carvatech), which was recruited by the Gletscherbahn Kaprun (GBK) for renovations. It might have not had so large repercussions if anyone of the actors during those renovations had done his job correctly tho:

  • the model chosen was for household use and chosen because the recommended fan heater was unavailable
  • other departments of Swoboda (and because of that, everyone else) were not informed about this change, even leading to sending out the documentation of the recommended fan heater to GBK
  • the fan heater was mounted in a way that allowed liquids to leak inside of it
  • it was mounted directly in front of the hydraulics, which contained flammable liquids
  • those hydraulics were redone during the renovations by Mannesmann-Rexroth AG (now Bosch Rexroth AG), and were done using plastic pipes and were not appropriately encased.
  • They started melting because of the malfunctioning heater, spraying flammable oil at 190 bar into the fire
  • the dropping oil pressure caused the train to automatically break
  • but the hydraulics were also needed to open the goddamn doors.

On top of all that, because the cable cars were made of aluminium, they were deemed inflammable. This did not take into account that any installed equipment or passengers and their luggage might NOT be fireproof.

This lead to: no fire exits, no emergency signage, no training for employees how to react in case of fire. (which might have saved a lot of people: the 12 survivors were the people who went downwards, passing the fire, because they listened to a fireman onboard the cable car.)

it was a single malfunctioning heater, but the Kaprun disaster had many fathers.

I found a nice paper regarding the different actors written by a student of the University of Virginia here, well sourced.

[–] mox@lemmy.sdf.org 2 points 3 months ago

Very informative. Thank you!

[–] llii@discuss.tchncs.de 1 points 3 months ago* (last edited 3 months ago)

I need to cite the German Wikipedia article, which I’ve read. It’s a good read and very long.

Abschließend wurde festgehalten: „Als Ergebnis der Ermittlungen der Staatsanwaltschaft Heilbronn lässt sich feststellen, dass sich das Unglück am 11. November 2000 hätte vermeiden lassen können, wenn seitens der Fa. Swoboda fahrzeuggeeignete Heizlüfter eingebaut worden wären, die es auf dem Markt gab.“